• 03
    08,2023
    On August 3, 2023, vice president Jia Geng and vice president Jin Xin of Beijing Energy International met Cheng Dejun, deputy mayor of Baoshan Municipal Government in Beijing. The two sides exchanged on in-depth cooperation in clean energy. Xiong Zhengjie, deputy secretary-general of Baoshan Municipal Government, Jiang Xuemei, director...
  • 02
    08,2023
    On August 1, 2023, the registered quota of Beijing Energy International’s multi-variety unified registered debt financing instrument (referred to as “DFI” or “panda perpetual bond”) was approved by National Association of Financial Market Institutional Investors (NAFMII). The registered amount of DFI this time is 5 billion yuan, ...
  • 02
    08,2023
    On July 28, 2023, Liu Guoxi, party secretary and chairman of the Trade Union of Beijing Energy International visited Han Zhiwei, vice president of Beijing Infrastructure Investment Co., Ltd., (BII) and the two sides exchanged on in-depth cooperation in clean energy. During the meeting, the two sides introduced their respective business fi...
  • 01
    08,2023
    On July 31, 2023, Zhang Ping, chairman of the Board of Directors of Beijing Energy International, met with Yang Meiling, chairperson of Huitian Network Technology in Beijing, and the two sides had in-depth exchanges on digital business cooperation. Li Lianjun, vice president of Hui Tian Network Technology, and Zhang Baozhi, chief finan...
  • 31
    07,2023
    Recently, the 90MW wind power project in Nadong, Tianyang District, Baise City, Guangxi and the 60MW wind power project in Gufeng, Tianyang District, Baise City, Guangxi, which were jointly applied by Beijing Energy International, were successfully included in the list of onshore wind power construction projects in Guangxi. This is the ...
  • 31
    07,2023
    On July 28, 2023, the review meeting of Beijing Energy International’s Environmental Impact Assessment (EIA) Report on Hydropower Planning in Xizang CYQ Basin was successfully held in Chengdu. The meeting was organized by the Department of Ecology and Environment of Xizang Autonomous Region and the Energy Bureau of Xizang Auto...
  • 27
    07,2023
    On July 26, 2023, the 220.55kW distributed photovoltaic project of Beijing Energy International’s Tianhu Conference Center in Fangshan District was connected to the grid for power generation. The project is the first distributed photovoltaic project for hotel operation of the company, and it will provide strong support for promoting the green an...
  • 26
    07,2023
    On July 26, 2023, Beijing Energy International’s 2.74MW distributed PV project in Beijing Economic and Technological Development Area (Tongzhou) was registered. Photo source: from the internet The project is located in Jinqiao Science and Technology Industrial Base of Tongzhou Park, Zhongguancun Science Park (ZSP), BETDA (...
  • 25
    07,2023
    On July 25, 2023, Beijing Energy International was assigned by Sustainable Fitch an ESG Entity of ‘2’ and an entity score of 76 and became the company with the highest published score of Fitch ESG in China. Meanwhile, it holds the fourth place in the world and the second place in Asia among 72 companies in five industries (including publi...
  • 24
    07,2023
    On July 24, 2023, Beijing Energy International’s Zhigu 2.8MW distributed photovoltaic project in Xihongmen, Daxing District, Beijing was successfully registered. The project is located in No.10 Courtyard, Dingli Road, Daxing District, Beijing, with a planned total installed capacity of 2.8MW. The project can supply electricity for its...